
A stateless streamable HTTP MCP server for interacting with the official source of government spending data.

A hosted MCP server that scores contractor safety records, site hazards, schedule delays, and regulatory burden to produce construction project underwriting verdicts from government data.
Construction Project Risk MCP Server is cataloged as an MCP server attributed to apifyforge. A hosted MCP server that scores contractor safety records, site hazards, schedule delays, and regulatory burden to produce construction project underwriting verdicts from government data. It is categorized under finance crypto. See the capability inspector for recorded interfaces and their independent review status; consult upstream documentation for the current interface.
Installation configuration is not reviewed. No executable setup is offered for this entry; inspect the source repository before proceeding.
Catalog license label: Not specified. Check the source repository's current license and terms before using, modifying or distributing this software.
Capability definitions are not reviewed. Unreviewed imports are not exposed as trusted interfaces.
No reviewed records to display. This does not establish that upstream lacks this capability.
No reviewed records to display. This does not establish that upstream lacks this capability.
No reviewed records to display. This does not establish that upstream lacks this capability.
Email delivery is not connected. This page does not collect email addresses or create subscriptions.
Browse the registry for current listings instead.
Reviews for Construction Project Risk MCP Server are not available yet
Review publishing and storage are not connected. This page does not collect or publish ratings or comments, including after sign-in.
The composite inverts each risk score (100 minus score) and weights them: Contractor Risk 30%, Site Risk 25%, Schedule Risk 20%, and Regulatory Compliance 25%, so higher composite scores mean better approvability.
Site hazard data from USGS and NOAA has global coverage and OpenCorporates covers 140+ jurisdictions, but OSHA and EPA enforcement data is US-only.
A composite score between 50 and 69, indicating meaningful but manageable risk, with the recommendations array listing the specific conditions triggered.
README.md · 7f51af280fa8 · Fetched 2026-11-13 12:15:58 UTC
Original upstream text, without AI rewriting. Scripts, forms and unsafe links are filtered for safety.
Showing the last retrieved documentation snapshot; check the source for current changes.
Add to your MCP client (Claude Desktop, Cursor, Windsurf):
{
"mcpServers": {
"construction-project-risk-mcp": {
"url": "https://ryanclinton--construction-project-risk-mcp.apify.actor/mcp"
}
}
}
Construction project risk intelligence delivered directly to your AI agent via the Model Context Protocol. This MCP server scores contractor safety records, evaluates site hazards, forecasts schedule delays, and generates project underwriting reports — all from live government data sources, all in a single tool call.
Eight data sources feed four independent scoring models. A composite underwriting engine weighs contractor risk (30%), site risk (25%), schedule risk (20%), and regulatory compliance burden (25%) to produce an APPROVE, APPROVE_WITH_CONDITIONS, ENHANCED_REVIEW, or DECLINE verdict. Surety underwriters, construction lenders, and project owners get objective, auditable due diligence in seconds rather than weeks.
| Data Point | Source | Example |
|---|---|---|
| 📋 Contractor background and litigation signals | Company Deep Research | Lawsuits, defaults, fraud indicators, press coverage |
| 🏢 Corporate entity registrations | OpenCorporates (140+ jurisdictions) | Active/dissolved status, officer names, filing history |
| ☣️ Environmental violations and penalties | EPA ECHO | NPDES permit violations, significant non-compliance quarters |
| 🦺 OSHA citations and penalty history | OSHA Inspections Database | Willful, repeat, serious violations; penalty dollar amounts |
| 🌩️ Weather hazards and severe alerts | NOAA Weather Alerts | Tornado, hurricane, flood, blizzard — severity-classified |
| 🌍 Site geocoding and location analysis | Nominatim Geocoder | Coordinate resolution for site-specific hazard mapping |
| 🔴 Seismic activity and earthquake risk | USGS Earthquake Database | Magnitude, depth, frequency near project site |
| 📜 Construction regulatory changes | Federal Register | Proposed OSHA rules, EPA standards, enforcement actions |
Manual contractor due diligence requires pulling OSHA inspection reports, requesting EPA compliance histories, running corporate registry searches across multiple states, and commissioning site hazard assessments separately. A thorough pre-qualification for a single contractor takes 3-5 days and often costs $2,000-5,000 in staff time and consultant fees. The data still arrives in disparate formats with no composite score.
This MCP server automates the entire process. An AI agent calls one tool, eight government databases are queried in parallel, and structured risk scores arrive in under two minutes. No manual lookups, no fragmented reports, no spreadsheet assembly.
benchmark_contractor_peerSurety underwriters need objective contractor safety and financial health data before issuing performance and payment bonds. Manual prequalification questionnaires are self-reported and easily manipulated. This MCP server pulls OSHA citations, EPA violations, and corporate registry data from government sources that contractors cannot edit. Use assess_contractor_risk for rapid prequalification screening and generate_project_underwriting_report for full bond decisions.
Construction lenders face dual risk: the contractor completing the project and the site itself. A borrower may present an experienced GC who has three willful OSHA violations and two EPA significant non-compliance periods. Use generate_project_underwriting_report to evaluate both dimensions before loan commitment. The composite score and APPROVE/DECLINE verdict maps directly into credit memos.
General contractors qualifying subcontractors for large projects need scalable safety screening. Manually pulling OSHA data for 30 subcontractor candidates takes days. Use audit_safety_record in batch to surface candidates with serious or willful violations before final invitation to bid. Firms with multiple repeat violations or $100K+ in OSHA penalties are flagged automatically.
Owners selecting between candidate sites need objective hazard comparisons before committing to land acquisition. Use evaluate_site_hazards with each candidate address to score seismic risk, weather exposure, and environmental contamination proximity. Sites near Superfund facilities or in high-magnitude earthquake zones receive elevated scores that feed directly into go/no-go recommendations.
Owner's representatives overseeing active construction projects can use forecast_regulatory_impact to monitor Federal Register activity for proposed OSHA standards or EPA rules that may affect ongoing work. New proposed construction regulations and enforcement actions update the schedule risk score, giving early warning of potential stop-work risk.
Property and casualty insurers underwriting construction all-risk or builder's risk policies can use this MCP server to benchmark the contractor's safety record before binding coverage. OSHA penalty history and EPA compliance status correlate with claims frequency. A contractor scoring ELEVATED or above on the Contractor Risk model may warrant higher premiums or exclusions.
| Tool | Price | Description |
|---|---|---|
assess_contractor_risk | $0.045 | Comprehensive contractor risk score from OSHA violations, EPA compliance, corporate health, and litigation signals |
audit_safety_record | $0.045 | Detailed OSHA inspection and citation history: violation types, penalty amounts, serious and willful violations |
check_environmental_compliance | $0.045 | EPA ECHO compliance history: violations, permits, cleanup sites, significant non-compliance quarters |
evaluate_site_hazards | $0.045 | Site-specific hazards: seismic risk (USGS), weather exposure (NOAA), contamination proximity (EPA), geocoding |
verify_contractor_entity | $0.045 | Contractor corporate registration status across 140+ jurisdictions, dissolved entities, financial signals |
forecast_regulatory_impact | $0.045 | Upcoming construction regulations from Federal Register: proposed rules, enforcement trends, compliance forecasts |
benchmark_contractor_peer | $0.045 | OSHA and EPA record comparison for a target contractor with sector-specific peer context |
generate_project_underwriting_report | $0.045 | Full underwriting report: all 8 sources, 4 scoring models, composite score, APPROVE/DECLINE verdict, recommendations |
Add this to your claude_desktop_config.json:
{
"mcpServers": {
"construction-project-risk": {
"url": "https://construction-project-risk-mcp.apify.actor/mcp",
"headers": {
"Authorization": "Bearer YOUR_APIFY_TOKEN"
}
}
}
}
Add the same URL and token to your MCP server settings. The server uses the MCP Streamable HTTP transport, which all major MCP clients support.
import httpx
response = httpx.post(
"https://construction-project-risk-mcp.apify.actor/mcp",
headers={
"Authorization": "Bearer YOUR_APIFY_TOKEN",
"Content-Type": "application/json"
},
json={
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"name": "generate_project_underwriting_report",
"arguments": {
"contractor": "Pinnacle General Contractors",
"location": "Houston, TX",
"sector": "commercial"
}
},
"id": 1
}
)
report = response.json()["result"]["content"][0]["text"]
print(report)
const response = await fetch("https://construction-project-risk-mcp.apify.actor/mcp", {
method: "POST",
headers: {
"Authorization": "Bearer YOUR_APIFY_TOKEN",
"Content-Type": "application/json"
},
body: JSON.stringify({
jsonrpc: "2.0",
method: "tools/call",
params: {
name: "assess_contractor_risk",
arguments: { contractor: "Meridian Construction Group", location: "Dallas, TX" }
},
id: 1
})
});
const data = await response.json();
const risk = JSON.parse(data.result.content[0].text);
console.log(`Risk score: ${risk.contractorRisk.score} — ${risk.contractorRisk.riskLevel}`);
curl -X POST "https://construction-project-risk-mcp.apify.actor/mcp" \
-H "Authorization: Bearer YOUR_APIFY_TOKEN" \
-H "Content-Type: application/json" \
-d '{
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"name": "evaluate_site_hazards",
"arguments": { "location": "2801 N. Houston Ave, Houston TX 77009" }
},
"id": 1
}'
The generate_project_underwriting_report tool returns a structured JSON report. Below is a representative output for a commercial contractor in a weather-exposed Gulf Coast location.
{
"entity": "Meridian Construction Group",
"compositeScore": 58,
"verdict": "APPROVE_WITH_CONDITIONS",
"contractorRisk": {
"score": 41,
"oshaViolations": 6,
"seriousViolations": 2,
"epaViolations": 1,
"corporateEntities": 4,
"riskLevel": "ELEVATED",
"signals": [
"2 serious/willful OSHA violations — major safety concern",
"6 OSHA inspections — frequent regulatory attention",
"$87K in OSHA penalties — pattern of non-compliance"
]
},
"siteRisk": {
"score": 38,
"seismicEvents": 1,
"weatherAlerts": 7,
"environmentalFlags": 2,
"riskLevel": "ELEVATED",
"signals": [
"7 weather alerts — weather-challenged location",
"2 environmental contamination indicators near site"
]
},
"scheduleRisk": {
"score": 44,
"weatherDays": 14,
"regulatoryActions": 3,
"riskLevel": "MODERATE_DELAYS",
"signals": [
"Estimated 14 weather-affected days — significant schedule impact",
"2 serious violations — stop-work order risk"
]
},
"regulatoryCompliance": {
"score": 31,
"regulationCount": 3,
"oshaRequirements": 6,
"epaRequirements": 2,
"burdenLevel": "ELEVATED",
"signals": [
"3 construction-specific regulations — dense regulatory environment",
"2 environmental permits required — EPA compliance overhead"
]
},
"allSignals": [
"2 serious/willful OSHA violations — major safety concern",
"6 OSHA inspections — frequent regulatory attention",
"$87K in OSHA penalties — pattern of non-compliance",
"7 weather alerts — weather-challenged location",
"2 environmental contamination indicators near site",
"Estimated 14 weather-affected days — significant schedule impact",
"2 serious violations — stop-work order risk",
"3 construction-specific regulations — dense regulatory environment",
"2 environmental permits required — EPA compliance overhead"
],
"recommendations": [
"Require safety improvement plan and third-party safety monitor",
"Build weather contingency buffer into project timeline",
"Engage regulatory counsel — dense compliance environment",
"Phase I/II environmental site assessment recommended"
]
}
| Field | Type | Description |
|---|---|---|
entity | string | Contractor name from input |
compositeScore | number | Weighted composite underwriting score (0-100, higher = more approvable) |
verdict | string | Underwriting verdict: APPROVE, APPROVE_WITH_CONDITIONS, ENHANCED_REVIEW, or DECLINE |
contractorRisk.score | number | Contractor risk score (0-100, higher = riskier) |
contractorRisk.oshaViolations | number | Total OSHA inspections found |
contractorRisk.seriousViolations | number | Willful, repeat, serious, or failure-to-abate violations |
contractorRisk.epaViolations | number | EPA violation records found |
contractorRisk.corporateEntities | number | Corporate registrations found across jurisdictions |
contractorRisk.riskLevel | string | LOW, MODERATE, ELEVATED, HIGH, or CRITICAL |
contractorRisk.signals | string[] | Human-readable risk flags with supporting data |
siteRisk.score | number | Site hazard score (0-100, higher = more hazardous) |
siteRisk.seismicEvents | number | Earthquake records near site |
siteRisk.weatherAlerts | number | NOAA weather alerts for the area |
siteRisk.environmentalFlags | number | EPA contamination indicators near site |
siteRisk.riskLevel | string | LOW, MODERATE, ELEVATED, HIGH, or EXTREME |
siteRisk.signals | string[] | Site-specific hazard flags |
scheduleRisk.score | number | Schedule delay risk score (0-100) |
scheduleRisk.weatherDays | number | Estimated weather-affected work days |
scheduleRisk.regulatoryActions | number | Federal Register actions affecting the project |
scheduleRisk.riskLevel | string | ON_TRACK, MINOR_DELAYS, MODERATE_DELAYS, MAJOR_DELAYS, or CRITICAL |
scheduleRisk.signals | string[] | Delay risk flags |
regulatoryCompliance.score | number | Regulatory compliance burden score (0-100) |
regulatoryCompliance.regulationCount | number | Federal Register regulations applicable to the project |
regulatoryCompliance.oshaRequirements | number | OSHA inspections in the area |
regulatoryCompliance.epaRequirements | number | EPA records for the entity or location |
regulatoryCompliance.burdenLevel | string | MINIMAL, STANDARD, ELEVATED, HEAVY, or PROHIBITIVE |
regulatoryCompliance.signals | string[] | Compliance burden flags |
allSignals | string[] | Consolidated signal list from all four models |
recommendations | string[] | Specific mitigation steps triggered by score thresholds |
| Contractor Risk Score | Risk Level | Underwriting Guidance |
|---|---|---|
| 0-19 | LOW | Standard terms, favorable rates |
| 20-39 | MODERATE | Standard terms with conditions |
| 40-59 | ELEVATED | Enhanced requirements, higher premiums |
| 60-79 | HIGH | Restricted terms, significant conditions |
| 80-100 | CRITICAL | Auto-decline or require exceptional mitigation |
| Composite Underwriting Score | Verdict |
|---|---|
| 70-100 | APPROVE |
| 50-69 | APPROVE_WITH_CONDITIONS |
| 30-49 | ENHANCED_REVIEW |
| 0-29 | DECLINE |
Construction Project Risk MCP Server uses pay-per-event pricing — you pay $0.045 per tool call. Platform compute costs are included.
| Scenario | Tool calls | Cost per call | Total cost |
|---|---|---|---|
| Quick contractor check | 1 | $0.045 | $0.045 |
| Contractor + site hazards | 2 | $0.045 | $0.09 |
| Full pre-qualification (3 tools) | 3 | $0.045 | $0.135 |
| Full underwriting report | 1 | $0.045 | $0.045 |
| Monthly active portfolio (50 checks) | 50 | $0.045 | $2.25 |
You can set a maximum spending limit per run to control costs. The actor stops when your budget is reached.
Compare this to traditional contractor prequalification services at $150-500 per report, or dedicated risk platforms like Procore, Dodge Data, or ISN at $5,000-20,000 per year. Most underwriting workflows with this MCP server cost under $0.50 total.
When a tool is called, runActorsParallel dispatches simultaneous HTTP calls to up to eight sub-actors on the Apify platform. Each sub-actor is allocated 512MB memory with a 120-second timeout. OSHA inspections, EPA ECHO records, OpenCorporates filings, USGS earthquake events, NOAA weather alerts, Nominatim geocoding, Federal Register documents, and Company Deep Research outputs are all fetched concurrently — not sequentially — so total latency is bounded by the slowest single source rather than the sum.
Four independent scoring models process the collected data:
Contractor Risk weights OSHA violations using violation type classification. The strings "willful", "repeat", "serious", and "failure to abate" are matched against each citation's violation_type field. Each serious violation adds 8 points; each inspection adds 3 points; the ceiling is 35 points from OSHA alone. EPA significant non-compliance is detected by checking qtrs_in_nc >= 4 or compliance_status containing "significant" — each adds 8 points. Corporate health checks company_status for "dissolv", "inactive", and "struck" patterns across all returned OpenCorporates entities.
Site Risk combines seismic magnitude thresholds (M4.0 significant, M5.0 high, scored via mag field from USGS), NOAA alert severity classification ("extreme", "severe", and event type keywords), and EPA proximity contamination using six keyword flags: hazardous waste, contamination, toxic, superfund, violation, and penalty.
Schedule Risk converts weather alerts to estimated lost work days: extreme events map to 5 days, severe events to 3 days, and standard alerts to 1 day. Federal Register documents are classified as proposed rules or enforcement actions by matching the type and title fields against "proposed", "enforcement", "penalty", and "stop work" patterns.
Regulatory Compliance identifies construction-applicable Federal Register rules by matching title fields against "construction", "building", "safety", and "osha". EPA records are classified for permit type (NPDES permits) and remediation activity (cleanup, remediation, superfund).
The composite score inverts each risk score (100 - score) before weighting: Contractor Risk 30%, Site Risk 25%, Schedule Risk 20%, Regulatory Compliance 25%. This means a contractor who scores 0 on all risk axes produces a composite of 100 (maximum approvability). Two hardcoded override rules can force a DECLINE regardless of composite score: CRITICAL contractor risk level (score 80+) or EXTREME site risk (score 80+) combined with HIGH contractor risk (score 60+). The recommendations engine checks ten specific threshold conditions and generates targeted mitigation language for each triggered condition.
Include location with contractor name for assess_contractor_risk — The location parameter appends city and state to the Company Deep Research query, significantly improving the relevance of litigation and news signals for contractors with common names.
Use audit_safety_record before assess_contractor_risk for large bid lists — The safety audit costs the same and surfaces the most critical disqualifiers (serious/willful OSHA violations) without running the full four-source contractor risk assessment. Screen out hard rejects cheaply first.
Pass street addresses to evaluate_site_hazards — A specific street address produces better geocoding precision in Nominatim, which improves the geographic relevance of USGS earthquake and EPA proximity queries compared to a city name alone.
Specify the sector in forecast_regulatory_impact — The Federal Register query uses the sector string directly: "commercial construction", "residential construction", "infrastructure construction", "industrial construction". Matching the Federal Register's language returns more relevant regulatory documents.
Run generate_project_underwriting_report for final decisions, targeted tools for screening — The underwriting report calls all eight data sources and all four scoring models in a single $0.045 charge. For initial screening of many contractors, the individual tools are equally priced but faster because they call fewer sub-actors. Use individual tools to filter, then the full report to underwrite the finalists.
Check recommendations before writing conditions — The recommendations array surfaces the specific mitigation steps triggered by the scoring thresholds: seismic engineering reviews, Phase I/II environmental assessments, safety improvement plans. These map directly to standard underwriting conditions language.
| Actor | How to combine |
|---|---|
| OSHA Inspection Search | Pull raw OSHA inspection records for manual review beyond what the MCP server surfaces |
| EPA ECHO Search | Deep-dive environmental compliance history for facilities near a project site |
| Company Deep Research | Full contractor intelligence report covering litigation, press coverage, and financial signals |
| OpenCorporates Search | Verify contractor corporate structure and officer history across all 140+ jurisdictions independently |
| Federal Register Search | Monitor specific regulatory dockets for construction standards that affect active projects |
| USGS Earthquake Search | Extract raw seismic event data for engineering review without the scoring layer |
| NOAA Weather Alerts | Pull historical weather alert frequency for a region to model construction schedule risk independently |
No OSHA records returned despite known contractor history — The OSHA Inspections Database indexes records by establishment name as filed with OSHA. Contractors operating under a DBA, subsidiary name, or joint venture entity may have records under a different legal name than the one entered. Try the contractor's exact legal entity name from their contractor's license or corporate filing.
Composite score does not match individual model scores — The composite score is calculated from inverted risk scores (100 minus each model's score), weighted and summed. A contractor with a high 80-point Contractor Risk score contributes (100-80) x 0.30 = 6 points to the composite — reflecting high risk. The composite measures approvability, not risk, so a high composite score means low overall risk.
generate_project_underwriting_report taking longer than expected — This tool queries all eight sub-actors in parallel with a 120-second timeout each. The overall response time is bounded by the slowest sub-actor, typically 30-90 seconds. If the call times out, retry once — transient API timeouts on individual government data sources are the most common cause.
DECLINE verdict on a contractor you expected to approve — Check the contractorRisk.riskLevel field. If it reads CRITICAL (score 80+), the hardcoded override rule forces DECLINE regardless of site and regulatory scores. Review allSignals for the specific OSHA or EPA records driving the CRITICAL rating.
Site hazard scores differ from expected for a known low-risk location — USGS earthquake queries use the location string to search proximity to the site. Vague location strings (city names only) may return seismic events from a broader radius than the actual project site. Pass a street address for more precise geographic filtering.
How does construction project risk scoring work in this MCP server? The server runs four independent scoring models — Contractor Risk, Site Risk, Schedule Risk, and Regulatory Compliance — each on a 0-100 scale. A composite underwriting engine weights all four (30/25/20/25) and inverts the scores so higher composite scores mean better approvability. The final verdict (APPROVE through DECLINE) is derived from the composite score, with two hardcoded DECLINE overrides for extreme contractor or site conditions.
What OSHA violation types trigger the highest risk scores? Willful, repeat, serious, and failure-to-abate violations are classified as serious violations and score 8 points each in the Contractor Risk model, compared to 3 points for a standard inspection record. Two or more serious violations trigger a signal flag. Penalties exceeding $100,000 in aggregate also trigger a non-compliance pattern flag.
Does this MCP server cover international construction projects? Site hazard data from USGS earthquakes and NOAA weather alerts has global coverage. Corporate data from OpenCorporates covers 140+ jurisdictions worldwide. However, OSHA and EPA enforcement data is US-only. International contractors working only outside the US will have no OSHA or EPA records regardless of their safety history.
How current is the OSHA and EPA data? All data is fetched live at the time of the tool call from the OSHA public inspections database and EPA ECHO. OSHA inspections are published after the inspection process concludes, which typically means a delay of weeks to months after an actual inspection. EPA non-compliance records reflect the most recently published quarterly compliance data.
How is this different from ISN, Avetta, or Browz contractor prequalification? ISN, Avetta, and Browz rely primarily on self-reported contractor questionnaires and document uploads, then charge $5,000-20,000+ per year for platform access. This MCP server pulls from government databases that contractors cannot edit, costs $0.045 per query, and integrates directly into AI agent workflows. It is most useful for rapid screening and due diligence augmentation, not as a replacement for full prequalification programs with document management.
Can I use this MCP server to qualify subcontractors for federal government projects? The data sources (OSHA, EPA, Federal Register, SAM.gov equivalents via OpenCorporates) overlap with federal prequalification requirements. However, federal contractor prequalification involves additional databases including SAM.gov debarment lists and Past Performance Information Retrieval System (PPIRS). Use Company Deep Research alongside this server for federal debarment screening.
How long does a full underwriting report take?
generate_project_underwriting_report queries eight sub-actors in parallel. Typical response time is 30-90 seconds. Individual tools like assess_contractor_risk (four sources) typically complete in 20-60 seconds.
Can I schedule regular contractor monitoring with this server?
Yes. Use the Apify platform's scheduling feature to call assess_contractor_risk or audit_safety_record on a weekly or monthly basis for a watchlist of active contractors. Set up webhooks to alert when a contractor's risk level changes or when new OSHA citations appear.
Is it legal to use OSHA and EPA data for underwriting decisions? OSHA and EPA enforcement data are public government records published for public use. Using them in underwriting and lending decisions is standard practice in the insurance and construction finance industries. This data does not constitute a consumer report under FCRA because it is drawn from public enforcement databases, not credit bureaus. Consult legal counsel for jurisdiction-specific compliance requirements.
What does the APPROVE_WITH_CONDITIONS verdict mean?
The composite underwriting score fell between 50 and 69, indicating meaningful but manageable risk. The recommendations array in the report output lists the specific conditions triggered: for example, requiring a third-party safety monitor, a Phase I environmental assessment, or a weather contingency buffer in the project schedule. These map directly to standard underwriting condition language.
Can I compare two contractors against each other?
Run assess_contractor_risk or benchmark_contractor_peer for each contractor separately. The numeric scores (0-100) and risk levels (LOW through CRITICAL) are directly comparable across calls. benchmark_contractor_peer also accepts a sector parameter that adds industry peer context to the OSHA and EPA queries.
What happens if one of the eight data sources returns no results? Each sub-actor call is wrapped in error handling that returns an empty array on failure rather than crashing the report. Scoring models treat empty arrays as zero contributions from that source — for example, zero OSHA records produces zero OSHA points. The only exception is zero corporate registrations, which contributes a 15-point legitimacy flag to the Contractor Risk score.
If you encounter issues, you can help us debug faster by enabling run sharing in your Apify account:
This lets us see your run details when something goes wrong, so we can fix issues faster. Your data is only visible to the actor developer, not publicly.
Found a bug or have a feature request? Open an issue in the Issues tab on this actor's page. For custom solutions or enterprise integrations, reach out through the Apify platform.
Claim this server with your GitHub account to request manual ownership verification.
Link to the catalog listing for Construction Project Risk MCP Server from your README. This badge does not certify ownership, compatibility or security.
[](https://awesome-mcp.com/servers/construction-project-risk-mcp)Public repository statistics could not be verified. Check the configured source address; unavailable counts are not zero.
Separate sources, scopes and periods. Never combined or treated as installations, active users or security reviews.
No reviewed package or image identity; download statistics are not listed yet.
Alternative and complementary servers in the same category

A stateless streamable HTTP MCP server for interacting with the official source of government spending data.

A hosted, remote MCP server for Fortnox that lets AI assistants answer questions from a company's bookkeeping and propose changes for approval before writing them.

OptimistFi is a read-only remote MCP server that provides perpetual futures market data, perps prop firm rules and pricing, and US equity investment research.